The canopies will shelter materials from rain and provide more protection against runoff, according to city officials.
The structures will be between 20 to 26 feet high. The recycling facility also will add a 300-foot-long concrete slab for storage of metals, paper, glass and plastic and other recyclables.
Funds for the upgrades will come from a $12.5 million bond sale the council approved last year for upgrades at the plant, which it operates with Napa Recycling and Waste Services.
The remaining bond funds will be devoted to building a covered composting system to improve air quality and improvements in stormwater processing. The plant is required by the state to cover its composting area by 2018. The article says improvement to the composting area will be a critical part in managing food scraps it started collecting in 2015 as part of its goal to achieve a 75 percent recycling rate by 2020. A contract for those upgrades is expected to go before the council in September, according to the article.
Latest from Waste Today
- Vecoplan to present modular solutions at IFAT 2026
- Terex Ecotec appoints Bradley Equipment as Texas distributor
- My Green Michigan expands depackaging capacity
- Washington selects Circular Action Alliance as PRO
- Ten-8 Industrial opens new central Florida service center
- Triumvirate Environmental acquires Environmental Waste Minimization
- Official NYC Bin availability expands ahead of deadline
- US Food Waste Pact’s 2025 Impact Report shows decrease in food waste